Mackinaw Wind Project

Located on Mackinaw City’s waste water plant, this project was comprised of two wind turbine generators, each standing at 230 feet high with three 85-foot blades. Windemuller’s team designed and installed the primary distribution system for the 5MW wind farm, but only 2MW of power were installed. These were the first utility scale wind turbines ever installed in the state of Michigan.

Let's Talk

Windemuller works hard to maintain a reputation for outstanding service.

If you want to talk about how we can help your organization with an upcoming project,
complete our contact form. A member of our team will be in touch right away.